After-sales Service: | Online Support |
---|---|
Warranty: | 1 Year |
Type: | Concrete Pump |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
52m Small Concrete Pump Machine Hb52K Concrete Mixer with Pump
Description
|
Unit
|
Parameter value
|
|
Outline dimension
|
mm
|
13120×2500×3990
|
|
Overall weight
|
kg
|
34000
|
|
Chassis
|
Model
|
|
ZZ5347V484MD1
|
Max. speed
|
km/h
|
90
|
|
Max. grade-ability
|
%
|
40
|
|
Wheelbase
|
mm
|
4800+1400
|
|
Tire
|
|
315/80R22.5
|
|
Engine
|
Model
|
|
MC11.40-40
|
Max. power
|
kW
|
297
|
|
Max. torque
|
N·m/(r/min)
|
1900/1000~1400
|
|
Displacement
|
L
|
10.518
|
|
Emission standard
|
|
Eruo IV
|
|
Pumping system
|
Theoretical output
|
m³/h
|
170
|
Concrete pumping pressure
|
MPa
|
8
|
|
Theoretical pumping times
|
Time/min
|
23~26
|
|
Delivery cylinder diameter ×stroke
|
mm
|
φ260×2000
|
|
Max. diameter of pumping concrete
|
mm
|
≤40
|
|
Filling height
|
mm
|
1580
|
|
Concrete slump range
|
cm
|
8~23
|
|
Placing boom
|
Reach height
|
m
|
51.5
|
Reach depth
|
m
|
36.1
|
|
Slewingradius
|
m
|
46
|
|
Slewing angle
|
°
|
±270
|
|
Unfolding angle of the 1st section
|
°
|
90
|
|
Unfolding angle of the 2nd section
|
°
|
180
|
|
Unfolding angle of the 3rd section
|
°
|
180
|
|
Unfolding angle of the 4th section
|
°
|
240
|
|
Unfolding angle of the 5th section
|
°
|
210
|
|
Unfolding angle of the 6th section
|
°
|
120
|
|
Stabilizer span
|
Longitudinal span of stabilizer
|
mm
|
9540
|
Transverse span of front stabilizer
|
mm
|
9150
|
|
Transverse span of rear stabilizer
|
mm
|
10060
|
|
Others
|
Lubrication method
|
|
Automatic lubrication
|
Control method
|
|
Manual/remote control
|
|
Volume of water box
|
L
|
1200
|